Here I added a Video of the First Test Drive Maiden Voyage Nov. 22 2008
Here I added a Video of the First Test Drive Maiden Voyage Nov. 22 2008
At 9 pm I called my Regina my wife and said “Wifey, head toward the shop I want to share the first test drive of the EVSaturn with you.” Maiden Voyage Nov 22 I charged the battery for 40 minutes or so and checked again the workings of the contactors. I Shut the hood. (it…
I woke up this morning at 5:50 with a energy and drive one gets if something special is in the air. I feel like before this day is over I will “smell smoke”. Smelling smoke is a auto mechanic term used after rebuilding and engine and you have it together enough to start it up.…
So I have the basic setup of the control panel and now I tolt it over under the hood and place it above the motor/transmission. The rear of the panel will pivot on 2, half inch bolts and the front rests on a horizontal bar and bolts there in the center. So the final outlay…
In making this Plexiglas (acrylic glass or acrylic) shield in front of the DC-DC I learned ways not to cut, trim, break, mold or work plexiglass. This is the same 1/4 inch material I used for panel (with 1/4″ fiberglass). When cutting the plexiglass for the panel I used a Dewalt cut off saw with…
Here I mounted the Curtis Controller on the panel above the cooling fan on top of the heat exchanger with a space for the air to flow. Electrical Panel Bottom View Almost Ready: Here you can see the cooling fan on the left and the Anderson Disconnect on the right. On top is the Curtis…
Saturday Big EV work day. Enjoyed it. I end up spending 15 hours with the goal of getting the EV drivable and test drive around the block. Finished the day and night not near the goal but I made steady progress never the less. Main goal was the electrical control panel. Here was the first…
The Electrical Control Board will hold as many electrical components as I can ‘jam on it’. Sounds like a hip-hop song. Started with 1/4″ thick smoked color Plexiglas 14″ X 22″ and I was given a piece of 1/4” electrical board fiberglass 13″ X 22″ to go under it. So I started with this now…
The weekend of the 8th was busy with a Royal Ambassador hiking trip to Nathan Bedford Forrest State Park. So come Monday I returned to the long term EV Saturn project. The 50 feet of 2/0 welding cable EVAmerica sent me, to do the conversion was not enough. BTW 2/0 is called “two aught”. I…
Finish making all the cables. Used the big 3 foot crimper and shrink wrap the ends. Here is a view of a pair of cables before assembly with the ends stripped, 4 automotive style lugs, 4 shrink-wraps, cable cutter, hose cutter, stripper, heat gun, cable end insulators (black and red) The two cables assembled Using…